Home
Our Management
Project Reference
Contact Us
OUR PROJECT
80+
PROJECTS
Completed engineering and green building projects with precision and quality.
6
YEARS OF EXPERIENCE
Trusted expertise since 2019 as a BEM-registered ECP.
30+
CLIENTS
Serving 30+ satisfied clients with reliable, tailored solutions.
Overseas
Overseas
Augmentation works for Mt. Eriama Water Treatment Plant Additional Clarifier NCD, Papua New Guinea
(Ongoing)
Ministry of Utility and Telecommunication Sarawak (MUTS)
Ministry of Utility and Telecommunication Sarawak (MUTS)
ALAF Phase 4 for Kuching Division
(Ongoing)
Sport Complex / Stadium
Sport Complex / Stadium
Upgrading and Refurbishment of Apau Koyan Sport Complex
(Ongoing)
Water & Wastewater Supply
Water & Wastewater Supply
Integrity review and analysis of water pipe header support at Clarifier inlet in Tinjar WTP
(Completed)
Design and implementation of sludge discharge point, diversion, treatment and disposal system for water board water treatment plant
(Ongoing)
Upgrading works to water board water treatment Plant No.2 from 96MLD to 200MLD
(Ongoing)
Design and Build - Proposed Performance Based Contract for Short Term Solution for Acute Water Supply Shortage at Lubau Area, Betong Division
(Completed)
Design and Build: Proposed performance-based contact for short term solution for Acute Water Supply Shortage at Daro, Mukah
(Ongoing)
Projek Bekalan Air Luar Bandar (BALB) di kawasan Nanga Mujong, Bahagian Kapit
(Ongoing)
Hydraulic Study and Optimization of gravity flow from activated media filter to ceramic membrane filter at Rumah Ado
(Completed)
Hospital and Associated Works
Hospital and Associated Works
Electrical Integrity Audit and Reinstate for Meditel at Sarawak General Hospital Food Court, Mini Mall, Pharmacy and Family Mart
(Completed)
Kerja-kerja naiktaraf system Keselamatan Kebakaran di Hospital Sentosa Kuching
(Completed)
Theme Park & Museum
Theme Park & Museum
Bina Baru Galeri Warisan Melanau Fasa 3, Oya, Bahagian Mukah
(Ongoing)
Proposed Upgrading Works to Sarawak Culture Village Viewing Platform
(Ongoing)
CCTVs location planning and design for Borneo Culture Museum Restaurant
(Completed)
University/ School
University/ School
Cyberjaya College Satelite Campus and Hostel, Kuching
(Completed)
Pembinaan Gantian SK Datuk Bandar: Daif Sarawak
(Completed)
Cadangan Pembangunan Semula Sekolah Daif di Negeri Sarawak
(Completed)
Flood Mitigation
Flood Mitigation
Proposed Flood Mitigation and waterfront upgrading at Debak, Betong Division
(Ongoing)
Proposed Flood Mitigation Works at Asajaya, Drainage Scheme Block I, II, III & IV, Samarahan Division
(Ongoing)
Rancangan Tebatan Banjir Simunjan
(Ongoing)
Renewable Energy - Solar
Renewable Energy - Solar
NEM Sarawak (Domestic, Bintulu) - 11kWp @ Sebiew Indah, Mohammad bin Haji Ibrahim Residence
(Completed)
NEM Sarawak (Domestic, Kuching) - 8.25kWp @ Stampin Tengah, Lo Chai Chew Residence
(Completed)
NEM Sarawak (Domestic, Kuching) - 19.98kWp @ Tabuan Desa, Wong Ko Kwok Residence
(Completed)
NEM Sarawak (Commercial, Kuching) - 8.1kWp @ Aisha Lunchbox
(Completed)
NEM Sarawak (Coomercial) - Petchem
(Completed)
Proposed 294.6kWp solar system for Siang Heng (Sarawak) Sdn.Bhd.
(Ongoing)
800kWp Solar GCPV-NEMS to East Asia Palm Production Sdn. Bhd.
(Ongoing)
392.7kWp rooftop Solar NEM Sarawak for Centre for Technology Excellence Sarawak, Santubong Campus
(Ongoing)
72kWp rooftop Solar NEM Sarawak for Tenaga Kenari Sdn. Bhd.
(Ongoing)
Refurbishment Works
Refurbishment Works
Document Room at Bakun Hydroelectric Plant (HEP), Belaga, Sarawak
(Completed)
Residential
Residential
Residential development on Lot 789 at Jalan Kuching-Serian
(Ongoing)
Residential development on Lot 737 at Jalan Bau, Siniawan
(Ongoing)
Proposed Double Storey Terrace houses on Lot 154, Jalan Camar, Matang Jaya
(Ongoing)
Proposed Single Storey Semi-D House on Lot 337, Kampung Jeriah Barat, Sibu
(Ongoing)
Proposed Mansion Concept Quarters 1 (project 3), Mukah
(Ongoing)
Proposed Mansion Concept Bungalow 2 (project 2), Mukah
(Ongoing)
Proposed Mansion Concept Bungalow 1 (project 1), Mukah
(Ongoing)
Residential development on Lot 222 at Landeh
(Ongoing)
Residential development on Lot 221at Landeh
(Ongoing)
Residential development on Lot 233 at Landeh
(Ongoing)
Residential development on Lot 136 at Landeh
(Ongoing)
Residential development on Lot 563 at Samarahan
(Ongoing)
28 units of industrial Development at Lot 283, Bintulu
(Ongoing)
Factory/Warehouse
Factory/Warehouse
Proposed Renovation & Extension to existing Factory on Lot 746 at Demak Laut, Industrial Park (Phase 3)
(Ongoing)
Proposed Premix Road Plant on Lot 11293
(Ongoing)
SEB Document Room, Bakun
(Completed)
Design and Built: Modern Glass Sdn. Bhd. HT/LV system including a new 2000A MSB and associated works to existing 400A SSB
(Ongoing)
Design and built LPG Cylinder Factory at Lot 2222 in Kemena Land District Bintulu
(Completed)
Design and Built a Single-storey Detached including a storage and warehouse area at Mukah
(Completed)
Agricultural
Agricultural
Proposed Irrigation System at Bijat/Stumbin Paddy Granary area Sri Aman Division, Sarawak
(Ongoing)
Proposed 2-storey Office Building cum Single storey Warehouse on Lot 3369, Block 20, Kemena Land District, Bintulu
(Ongoing)
Upgrading of Power Generation System from Existing Steam Turbine Generators.
(Completed)
HT/LT Services for Greenpro Farm Sdn Bhd, Balingian, Mukah
(Completed)
Religious
Religious
Mukah Chinese Methodist Church, Mukah
(Ongoing)
Cemetery Raudhatul Sakinah, Samariang
(Ongoing)
Betong Iban Methodist Church, Betong
(Ongoing)
Building Information Modelling (BIM)
Building Information Modelling (BIM)
Design and build negotiated contract Proposed Wisma Premier Sarawak and Premier Sarawak Residence
(Ongoing)
Proposed for BIM Consulting Services for Proposed Extension of BCCK2, Kuching
(Ongoing)
Land Infrastructure
Land Infrastructure
Proposed Riverwall from Kampung Lintang to Kampung Tupong, Kuching Division
(Ongoing)
Proposed CSTR, Kuching and Samarahan Division Package D3C (Project Managemment/ Supervision)
(Ongoing)
Replacement Fire Hydrant Pipeline, Pending Terminal
(Ongoing)
Proposed CSTR Kuching and Samarahan Division Package D3B (Project Managemment/ Supervision)
(Ongoing)
Proposed Connecting Road and Bridge from Taman Kemena Taman Jason, Bintulu
(Ongoing)
Government Offices
Government Offices
Projek Pembangunan Baharu JPJ Limbang
(Ongoing)
Museum
Museum
Projek Bina Baru Galeri Warisan Melanau Fasa 3, Oya, Bahagian Mukah
(Ongoing)
Commercial Development
Commercial Development
Nando's outlet at Miri Bintang Megamall, Sarawak
(Completed)
Upgrading of Active Fire Protection System for Mr. DIY Outlets in Sarawak - Permy Mall Miri
(Ongoing)
Upgrading of Active Fire Protection System for Mr. DIY Outlets in Sarawak - Boulevard Kuching
(Ongoing)
Upgrading of Active Fire Protection System for Mr. DIY Outlets in Sarawak - Li Hua Plaza Bintulu
(Ongoing)
Upgrading of Active Fire Protection System for Mr. DIY Outlets in Sarawak - Tabuan Jaya (Soho 188) Kuching
(Ongoing)
Upgrading of Active Fire Protection System for Mr. DIY Outlets in Sarawak - Simen Raya Kuching
(Ongoing)
Upgrading of Active Fire Protection System for Mr. DIY Outlets in Sarawak - Jln Bleteh Kapit
(Ongoing)
Upgrading of Active Fire Protection System for Mr. DIY Outlets in Sarawak - Lachau Sri Aman
(Ongoing)
Upgrading of Active Fire Protection System for Mr. DIY Outlets in Sarawak - Eden Centre 3, Siburan
(Ongoing)
Upgrading of Active Fire Protection System for Mr. DIY Outlets in Sarawak - The Solaris Padawan
(Ongoing)
Upgrading of Active Fire Protection System for Mr. DIY Outlets in Sarawak - Demak Square Kuching
(Ongoing)
Upgrading of Active Fire Protection System for Mr. DIY Outlets in Sarawak - Wisma Wan Kuching
(Ongoing)
Other
Other
Proposed Replacement of Fire Hydrant Pipeline for Shed C and Berth 6, Pending Terminal
(Ongoing)
Power System Study and Identify Alternative Backup (UPS) Proposal for Borneo Adventure Kuching, Sarawak
(Completed)